Engineering rates: the bill rate nobody discloses — and the yield you can derive
Every founder who hires engineers eventually asks what the big firms charge per hour. The honest answer starts with a silence: no major IT-services or digital-engineering firm discloses a bill rate, at any level of cut. This page is the standing table pair built around that silence — a derived company yield table computed from the firms' own filings, error bars printed, and a by-country atlas of what engineers are paid versus what a senior hour is billed at.
The short answer
No major firm discloses a bill rate. Across eleven firms — Accenture, Infosys, TCS, Wipro, HCLTech, Cognizant, Globant, EPAM, Endava, CI&T, Thoughtworks — full-text searches of current filings, earnings releases, fact sheets and call transcripts for “bill rate,” “billing rate” and “rate per hour” return zero rate levels. What firms disclose is direction (“pricing stable”), contract mix (fixed-price share), and the inputs to a derivation: revenue, headcount, and sometimes utilization. The firms' silence is the story.
What CAN be computed is a derived yield: revenue per billable employee ÷ (utilization × available hours). It is gross revenue yield per billable hour — not a disclosed rate, not a rate card, and not profit. Read it as a mix map: offshore-scale delivery yields roughly $27–45 of revenue per billable hour; nearshore and premium digital engineering yields roughly $48–73; the blended giant sits in between because strategy work is averaged in. Every derived cell on this page prints its range and its error bar, because the honest number is a range.
Last updated: November 25, 2026 · Company periods: FY26 (Indian fiscal year ended Mar 31, 2026) through Q2 2026 · Country edition: 2026 · Every anchor figure comes from the named company's own filing or release, or the named survey.
Table A — derived company yield: gross revenue per billable hour
Realized revenue per billable hour (derived) — not a disclosed bill rate. Method, identical everywhere: revenue per billable employee ÷ (utilization × available hours per year), with available hours run at 1,760–2,080. Utilization is as reported where reported; where it is not reported, it is an explicit assumption and the output is a range, never a point. Blank derived cells are deliberate: the anchor is shown and the reason is printed rather than a modeled number.
| Company | Revenue per billable employee | Utilization | Derived gross revenue per billable hour | Period | Derivation note | Source |
| TCS | $51,353 | assumed — not disclosed | $27–43 (±35%) · central range $$30–37 | FY26 | Revenue per total employee — no billable split is disclosed. Utilization and billable share are both assumed, so the derived range comes off a sensitivity grid (central range $30–37). | FY26 annual results press release and fact sheet (year ended Mar 31, 2026) |
| Infosys | $64,840 | 84.4% — reported | $35–45 (±30%) · central range $$37–44 | FY26 | Revenue per software professional (310,887 of 328,594 employees; $61,346 per total employee). Utilization is reported. Fixed-price work is 54% of revenue and was never priced per hour. | FY26 results and fact sheet (year ended Mar 31, 2026) |
| Wipro | $43,270 | 83.4% — reported | Not derived — see note | FY26 | Not derived this pass. Lowest revenue per employee in the set (IT Services basis). Utilization is reported (83.4%), but the row is held back visibly rather than filled with a modeled number. Fixed-price share 52.4%. | FY26 results and Q2 FY27 datasheet |
| HCLTech | $65,400 | not disclosed | Not derived — see note | FY26 | Not derived. No utilization is disclosed. The company prints revenue per employee itself: $65,400 LTM to Q2 FY27 (computed FY26 figure $64,548). Software licence revenue sits in the numerator and would inflate any hourly figure. | Q2 FY27 results and fact sheet (company revenue-per-employee print) |
| Cognizant | $60,034 | 85% — reported | Not derived — see note | FY25 | Not derived this pass. Utilization is reported at 85% (flat for six quarters in the Q2 2026 supplement), but product and resale revenue (TriZetto plus third-party resale) sits in the numerator. | FY25 Form 10-K and Q2 2026 investor supplement |
| CI&T | $80,100 | assumed 75–80% | $48–61 (±15-20%) · central ~$54 | LTM to Q2 2026 | Revenue per billable employee is company-disclosed with a published formula: LTM revenue ÷ 12-month average billable headcount, excl. interns — the only metric in the set with a published formula. Utilization assumed at 75–80% for the hourly step. | Q2 2026 earnings release (Form 6-K) and call |
| Globant | $95,883 | assumed 75–80% | $58–73 (±15-20%) · central ~$64 | Q2 2026 (annualized) | Revenue per IT professional: computed $95,883 annualized; the company-disclosed figure is $95,800. Delivery headcount 25,632 of 27,411 (93.5%). Utilization was last printed at 78.2% in Q1 2025; this derivation assumes 75–80%. | Q2 2026 earnings release (Form 6-K) |
| EPAM | $99,895 | 78.3% — disclosed every quarter | $61–73 (±10-15%) · central ~$66 | Q2 2026 (annualized) | Revenue per delivery professional (≈56,650 of ≈62,850 employees). Utilization is disclosed every quarter — the tightest derivation in the set. | Q2 2026 earnings release (PR Newswire, Aug 2026) |
| Accenture | $91,086 | 93% — reported — consulting workforce only; see note | $47–70 (±35-40%) | FY26 | Revenue per total employee (814,391 staff). The 93% utilization figure is a consulting-workforce metric whose denominator is undefined and which almost certainly does not cover the whole workforce; strategy consulting and managed services are averaged together, so the range is wide. | FY26 Form 10-K and Q4 FY26 results (year ended Aug 31, 2026) |
| Endava FY2025 only — FY2026 under non-reliance notice | — | not disclosed | Not derived — see note | FY2025 | Not derived. FY2025 revenue was £772.3M — the last reliable year. FY2026 Q1–Q3 results were designated “should no longer be relied upon” after an Audit Committee accounting finding (Oct 28, 2026), and no period-matched billable headcount exists for FY2025. This row refreshes only when the FY2026 Form 20-F lands. | FY2025 Form 20-F; non-reliance notice, Oct 28, 2026 |
| Thoughtworks Final public period | — | not disclosed | Not derived — see note | Q3 2024 — final public period | Frozen. Taken private Nov 13, 2024 (Apax, $4.40/share). Indicative revenue per total employee is ≈$99,660 annualized — the highest in the set, on an onshore-heavy mix — but no billable split or utilization was disclosed in the final filings, so no derivation is defensible. This row never updates. | Q3 2024 Form 10-Q (final public filing) |
Why is the blended average so much lower than a US rate card?
Because the two numbers measure different things. A US rate card prices a named senior engineer, onshore, by the hour. The derived figure on this page is a company-wide blend across every geography, seniority level and contract type. Five mechanics close the gap:
It is a gross revenue yield — nothing more. The derived number divides ALL revenue by implied billable hours. It is gross revenue yield per billable hour: not profit, not a premium over cost, and not a rate card. Out of each derived dollar the firm still pays the engineer, the bench, project management, sales, facilities and tax before anything is left over.
Start from the per-employee anchor. Accenture books about $91K of revenue per employee per year (≈$91,086 in FY26). Spread over roughly 1,900 available hours, that is high-$40s per hour before utilization is even applied. A $150/hr rate card and a $91K revenue-per-employee business are the same industry seen from two different ends — the anchor arithmetic caps what any blend can be.
The pyramid does the rest. Delivery at the large firms is majority offshore and junior-heavy by design. The blended hour averages a small number of $200/hr US strategy hours with a large base of far cheaper delivery hours — Infosys reports onsite effort at just 22.6% of the total, and Wipro reports offshore at 62.2% of services revenue. A single blended $/hr conceals a likely 3–5× onsite-versus-offshore spread that no firm will split.
Most revenue was never priced per hour at all. More than half of revenue at most firms in the table is fixed-price, outcome-based or managed-services work: Infosys reports a 54% fixed-price share, Wipro 52.4%, Cognizant over 50%, and Accenture over 65% of bookings. Operations and BPO-style hours inside the same companies drag the blend further. Dividing that revenue by hours manufactures an hourly figure for work nobody charged by the hour — which is exactly why this page labels it derived, gross, and ranged.
The contrast that proves it: staffing firms DO print bill rates. US staffing firms sell hours, so they disclose the price of one: Resources Connection (RGP) prints an average bill rate of about $114/hr on its enterprise business and about $162/hr in consulting (Q1 FY27), and Kforce prints about $90/hr. Systems integrators sell outcomes, not hours — and have never adopted the staffing industry's disclosure habit. When a bill-rate level exists in public data, it is a staffing number.
Table B — the by-country atlas: pay, billed bands, and the honest multiple
Salary anchors are the best graded source per country (official statistics first, then audited local surveys, then self-reported compensation data — each cell tagged with its pay definition and universe). Billed bands are the Accelerance 2026 REGIONAL senior bands — Asia $31–41/hr, Europe $64–76/hr, Latin America $60–75/hr, and the US $100–160/hr from the 2025 edition — shown as regional approximations, because no current country-level billed source exists. The multiples are billed midpoint × 1,880 hours ÷ salary, computed two ways; read the senior-to-senior column, not the headline one.
| Country | Salary anchor (per year) | Pay definition | Billed senior band (per hour) | Multiple vs all-level median | Multiple, senior-to-senior | Confidence | Notes |
| United States | $135,980 — BLS OEWS median annual wage (software developers) | Employed gross wage (employer-reported) | $100–160 | 1.8× | — | High (salary) / Medium (billed) | Reference row. The billed band is what US-based outsourcing firms charge for a senior engineer; the salary is the employed median across all levels. Source: US BLS Occupational Employment and Wage Statistics (OEWS), May 2025. Billed basis: Accelerance Rates Guide 2025 edition - US senior band (the 2026 edition is regional-only; the US figure is carried from the 2025 edition and labeled as such). |
| India | $19,180–22,086 — Stack Overflow Developer Survey 2025 median (range across filters); Levels.fyi total comp $32294 (n=21914) | Self-reported total compensation | $31–41 | 3.1-3.5 (survey basis); 2.1 (Levels.fyi basis) | 2.1× | Medium-high | Two salary universes are shown because a self-reported survey median and a total-comp (incl. equity) median are different measures. Never cite NASSCOM for pay - it publishes no salary table. Source: Stack Overflow Developer Survey 2025 (pay n=23928); Levels.fyi snapshot read Oct 2026. Billed basis: Accelerance 2026 REGIONAL senior band - Asia (approximation; no current country-level billed source exists). |
| Poland | $58,300 — Senior actually-paid salary approx. $58300/yr (survey of actually-paid pay) | Actually-paid gross salary (survey) - the advertised median runs 18% above actually-paid | $64–76 | 1.9-2.3× | 2.3× | High | The senior-to-senior multiple uses the actually-paid senior salary, not the advertised median. Source: Just Join IT / No Fluff Jobs 2025/2026 reports. Billed basis: Accelerance 2026 REGIONAL senior band - Europe (approximation). |
| Ukraine | $41,400 — DOU.ua median net pay $3450/mo ($41400/yr) all levels; senior $4500/mo ($54000/yr) net | Net take-home pay (private-entrepreneur / FOP contracting is common) | $64–76 | 3.2× | 2.4× | High | Net-pay basis: gross-up comparisons need care. DOU.ua is the best local source audited for any country in this table. Source: DOU.ua salary survey, Dec 2025 edition (semi-annual). Billed basis: Accelerance 2026 REGIONAL senior band - Europe (approximation). |
| Romania | — — Levels.fyi total comp approx. RON 196848/yr (n=380) | Total compensation incl. equity (self-reported) | $64–76 | ~3× | ~2.4× | Low-medium | No A/B-tier salary source exists for Romania. The figure is carried in RON exactly as sourced - no USD conversion is invented, so salary_usd is blank. Source: Levels.fyi snapshot read Oct 2026 (n=380). Billed basis: Accelerance 2026 REGIONAL senior band - Europe (approximation). |
| Mexico | $55,894 — Howdy verified payroll median $55894/yr - US-facing remote employment only | Verified payroll (US-facing remote employment) | $60–75 | 2.3× | 1.6× | Medium-low | UNIVERSE WARNING: US-facing remote pay only. No local-market salary source exists; US-facing and local-market pay differ by up to 2x and must never share an unlabeled row. Source: Howdy verified payroll data, 2025. Billed basis: Accelerance 2026 REGIONAL senior band - Latin America (approximation). |
| Brazil | $35,618 — Levels.fyi total comp $35618 (all levels); Howdy US-facing payroll $53253 | Total compensation incl. equity (Levels.fyi basis); verified payroll on the US-facing basis | $60–75 | 3.6 (Levels.fyi basis); 2.4 (US-facing basis) | 1.4 (vs fully-loaded CLT employer cost) | Low | Three denominators, three universes. CLT employer social charges alone load salary cost by 1.6-1.8x, which is why the senior multiple against fully-loaded cost falls to 1.4x. Source: Levels.fyi snapshot read Oct 2026; Howdy verified payroll 2025. Billed basis: Accelerance 2026 REGIONAL senior band - Latin America (approximation). |
| Argentina | $40,978 — Levels.fyi total comp $40978 (n=172 - THIN SAMPLE); Howdy US-facing payroll $63163 | Total compensation incl. equity (self-reported) | $60–75 | 3.1 (Levels.fyi basis); 2.0 (US-facing basis) | — | Low | THIN SAMPLE (n<200): directional only. FX perishability is high - the conversion date must be restated every edition. Source: Levels.fyi snapshot read Oct 2026 (n=172); Howdy verified payroll 2025. Billed basis: Accelerance 2026 REGIONAL senior band - Latin America (approximation). |
| Colombia | $37,140 — Levels.fyi total comp $37140 - Bogota only, city sample (n=134 - THIN SAMPLE) | Total compensation incl. equity (self-reported, city sample) | $60–75 | 3.4 (city-sample basis); 2.3 (regional US-facing basis) | — | Low | THIN SAMPLE (n<200) and city-only: Bogota is not Colombia. Directional only. Source: Levels.fyi snapshot read Oct 2026 (n=134, Bogota). Billed basis: Accelerance 2026 REGIONAL senior band - Latin America (approximation). |
| Vietnam | $17,153 — ITviec full-stack median approx. $17153/yr (n=1839) | Self-reported salary (local market) | $31–41 | 3.9× | ~1.9× | Medium | The full-stack median is the all-level anchor; the senior-to-senior multiple is the honest comparison. Source: ITviec salary report 2025-26 (n=1839). Billed basis: Accelerance 2026 REGIONAL senior band - Asia (approximation). |
| Philippines | $16,800 — Levels.fyi approx. $16800 (n=93 - THIN SAMPLE); local senior range approx. $21000-32000 | Total compensation incl. equity (self-reported) | $31–41 | 4.0× | 2.1-3.2× | Low-medium | THIN SAMPLE (n<200): directional only. The local senior range is shown because the all-level figure understates the senior denominator. Source: Levels.fyi snapshot read Oct 2026 (n=93). Billed basis: Accelerance 2026 REGIONAL senior band - Asia (approximation). |
| Canada | $85,100 — Canada Job Bank median wage approx. $85100 USD; Stack Overflow median $91198 | Employed median wage (Job Bank basis); self-reported total comp on the survey basis | — | — | — | Salary only (high) | SALARY ONLY - no billed band is published for Canada. A directory band that prices Canada above the US is a listing artifact, not a market rate. Source: Canada Job Bank wage data, Nov 2025; Stack Overflow Developer Survey 2025. Billed basis: No credible billed band - the only directory band found prices Canada above the US, a listing artifact, and is not used. |
Regional band (Accelerance 2026) — approximation, not a country rate
The finding that disciplines the whole table
Senior-billed ÷ senior-salary multiples cluster at roughly 1.6–2.4× almost everywhere (US 1.8×, Poland ~2.3×, Ukraine 2.4×, Mexico 1.6×, Vietnam ~1.9×). The headline-grabbing 3–4× multiples appear only when a senior billed rate is divided by an all-level median salary — a category error. Any “5× markup” table is making that error, or measuring a currency move.
One country is deliberately missing: Egypt. Its only computable multiple (≈6.6×) measures Egyptian-pound devaluation against a stale 2024 billed band, not a markup — so it is excluded rather than published as a finding.
Methodology — read this before quoting any two numbers against each other
Table A — the derivation
Revenue per billable employee = revenue ÷ billable headcount, using each company's own delivery / billable split where it gives one (Infosys software professionals, EPAM delivery professionals, Globant IT professionals, CI&T billable headcount). Realized revenue per billable hour = that figure ÷ (utilization × available hours per year), with available hours run at 1,760 (220 days × 8h) to 2,080 (52 × 40h). Where a company discloses revenue per billable employee itself (CI&T, Globant, HCLTech), its own figure anchors the row.
What the derived figure is — and is not
It is realized gross revenue yield on labor. It divides all revenue — including the majority share that is fixed-price, outcome-based or managed services and was never priced per hour — by implied billable hours. It is not a bill rate, not a rate card, not a margin and not profit. The error bar printed in each cell is part of the figure: ±10–15% where utilization is disclosed (EPAM), ±35–40% where utilization and mix are both assumed or caveated (TCS, Accenture).
Table B — the multiples
Multiple = billed senior midpoint × 1,880 hours ÷ salary. The 1,880-hour year implies roughly 94% utilization — an upper bound; at a realistic 75–85% billable utilization every multiple falls 10–20%. Two multiples are printed because they answer different questions: billed-versus-median shows the spread across a whole workforce pyramid; senior-to-senior is the markup on the hour actually being sold.
What breaks the derivation — seven honesty notes
- Fixed-price / outcome revenue (the big one). Infosys 54% fixed-price, Wipro 52.4%, Accenture over 65% of bookings, Cognizant over 50%, plus output-priced AI engagement models at the digital firms. That revenue has no hours in the contract; dividing it by hours manufactures a rate nobody charged.
- Product, licence and resale revenue in the numerator. Banking-platform, software-licence and product-resale lines at several firms in the table all inflate the derived $/hr.
- Subcontractor pass-through. Infosys technical subcontractors are 8.9% of revenue, TCS external consultants 6.8%, HCLTech outsourcing 14.2% — the hours are real but the people are not in the headcount denominator, biasing the derived figure up.
- Period-end versus average headcount. Using a period-end headcount distorts revenue per employee by 1–4% in growing or shrinking workforces.
- Bench, trainees, sales and corporate staff. Only some firms give a usable billable proxy. Trainee treatment alone moves Infosys utilization between 81.1% and 84.4%.
- Onsite / offshore mix is blended away. A single blended $/hr conceals a likely 3–5× onsite-versus-offshore spread that no firm will split.
- AI productivity pass-through (new in 2026). The majors now report AI at roughly 10%+ of revenue with productivity benefits partly passed to clients — hours fall faster than revenue, so a derived $/hr rises mechanically even if true rate cards are being cut. Never read a rising derived figure as pricing power.
The six honesty labels on this page
These labels are part of the tables, not fine print. Every edition of this page carries all six:
- Billed rate ≠ salary ≠ profit. The billed-to-pay multiple is a gross ratio covering employer taxes and social charges (Brazil's CLT load alone is 1.6–1.8× salary cost), bench, project management, sales cost — and only then margin.
- Per-cell sourcing. Every salary and billed cell carries its source, edition, as-of date and sample size; a sample under 200 is flagged “thin sample, directional only” wherever it appears.
- Pay-definition tags. Every salary cell is tagged: gross wage / net take-home / total compensation incl. equity / advertised-not-paid / verified payroll. Untagged pay numbers are not comparable.
- Universe tags. “US-facing remote pay” and “local-market pay” differ by up to 2× in Latin America and the Philippines and never share an unlabeled row.
- Regional-billed disclaimer. The 2026 billed bands are regional (Asia / Europe / Latin America); the last country-level edition (2024) is a stale upper bound and is not used as a country rate.
- Utilization assumption stated. Table A names the utilization behind every derived figure — reported, disclosed, or assumed 75–80% — and Table B's multiples state their 1,880-hour basis.
The not-computable list — when disclosure ends
One name in the original research set cannot carry even an anchor row, and the reason is instructive enough to publish:
| Company | What is disclosed | Why no row |
| Luxoft (inside DXC) | Nothing standalone. The name appears in DXC's FY2026 Form 10-K only in Exhibit 21 (the subsidiary list); its economics sit inseparably inside DXC's Consulting & Engineering Services segment ($5,023M). | Absorbed into a segment in 2019; no standalone financials exist post-2019 (last standalone period: FY ended Mar 2019, pre-acquisition). There is no numerator and no denominator — the line is published to show how an acquisition ends disclosure. |
How this page stays current
Table A updates quarterly, after each company reports earnings. Every row carries its own period stamp, and a row is never silently carried onto a new period: the fresh revenue and the fresh headcount arrive together, from the same release, or the row does not change. Utilization assumptions are restated in every edition — an assumed utilization never quietly becomes a reported one.
Table B updates annually (the billed-band guide lands around November; the big developer survey around July; official wage statistics in spring), with Ukraine's local survey refreshed semi-annually (January and July). All currency conversions in an edition use one stated reference date, and no figure is carried past a 12-month staleness cap.
Frozen and flagged rows stay frozen and flagged: Thoughtworks shows its final public period (Q3 2024) permanently; Endava shows FY2025 only until its FY2026 annual filing lands and the non-reliance cloud lifts. A derived figure is never relabeled as a bill rate in any edition, and no pay figure is ever sourced to an industry body that publishes no salary table.
Next refreshes on the calendar: company earnings through November–February (the digital-engineering firms report in mid-November; the Indian majors' next quarter lands in January) · the 2027 billed-band guide (~November) · Ukraine's semi-annual survey (January and July).
The datasets
Both tables behind this page — every company row with its derivation note and source, and every country row with its pay definition, billed basis and multiples — as downloads:
Download engineering-yield.csv Download engineering-yield.json
Download engineering-country-rates.csv Download engineering-country-rates.json
Sources
- TCS — FY26 annual results press release and fact sheet (year ended Mar 31, 2026) (FY26)
- Infosys — FY26 results and fact sheet (year ended Mar 31, 2026) (FY26)
- Wipro — FY26 results and Q2 FY27 datasheet (FY26)
- HCLTech — Q2 FY27 results and fact sheet (company revenue-per-employee print) (FY26)
- Cognizant — FY25 Form 10-K and Q2 2026 investor supplement (FY25)
- CI&T — Q2 2026 earnings release (Form 6-K) and call (LTM to Q2 2026)
- Globant — Q2 2026 earnings release (Form 6-K) (Q2 2026 (annualized))
- EPAM — Q2 2026 earnings release (PR Newswire, Aug 2026) (Q2 2026 (annualized))
- Accenture — FY26 Form 10-K and Q4 FY26 results (year ended Aug 31, 2026) (FY26)
- Endava — FY2025 Form 20-F; non-reliance notice, Oct 28, 2026 (FY2025)
- Thoughtworks — Q3 2024 Form 10-Q (final public filing) (Q3 2024 — final public period)
- United States — US BLS Occupational Employment and Wage Statistics (OEWS), May 2025 · Accelerance Rates Guide 2025 edition - US senior band (the 2026 edition is regional-only; the US figure is carried from the 2025 edition and labeled as such)
- India — Stack Overflow Developer Survey 2025 (pay n=23928); Levels.fyi snapshot read Oct 2026 · Accelerance 2026 REGIONAL senior band - Asia (approximation; no current country-level billed source exists)
- Poland — Just Join IT / No Fluff Jobs 2025/2026 reports · Accelerance 2026 REGIONAL senior band - Europe (approximation)
- Ukraine — DOU.ua salary survey, Dec 2025 edition (semi-annual) · Accelerance 2026 REGIONAL senior band - Europe (approximation)
- Romania — Levels.fyi snapshot read Oct 2026 (n=380) · Accelerance 2026 REGIONAL senior band - Europe (approximation)
- Mexico — Howdy verified payroll data, 2025 · Accelerance 2026 REGIONAL senior band - Latin America (approximation)
- Brazil — Levels.fyi snapshot read Oct 2026; Howdy verified payroll 2025 · Accelerance 2026 REGIONAL senior band - Latin America (approximation)
- Argentina — Levels.fyi snapshot read Oct 2026 (n=172); Howdy verified payroll 2025 · Accelerance 2026 REGIONAL senior band - Latin America (approximation)
- Colombia — Levels.fyi snapshot read Oct 2026 (n=134, Bogota) · Accelerance 2026 REGIONAL senior band - Latin America (approximation)
- Vietnam — ITviec salary report 2025-26 (n=1839) · Accelerance 2026 REGIONAL senior band - Asia (approximation)
- Philippines — Levels.fyi snapshot read Oct 2026 (n=93) · Accelerance 2026 REGIONAL senior band - Asia (approximation)
- Canada — Canada Job Bank wage data, Nov 2025; Stack Overflow Developer Survey 2025 · No credible billed band - the only directory band found prices Canada above the US, a listing artifact, and is not used
Questions
What is a typical software engineering bill rate?
There is no disclosed “typical” from the firms themselves — none of the eleven majors publishes a bill rate. What public data supports: derived gross revenue yields of roughly $27–73 per billable hour depending on delivery mix (Table A); billed senior bands of $100–160/hr in the US and $31–76/hr across Asia, Europe and Latin America from the Accelerance regional guides (Table B); and the only true disclosed bill-rate levels in the industry, from US staffing firms — roughly $90/hr (Kforce) to $114–162/hr (Resources Connection). Anyone quoting you a single “typical” rate without a mix, a seniority level and a source is guessing.
Why don't Accenture or Infosys publish their rates?
Because they do not sell hours. Over half of their revenue is fixed-price, outcome-based or managed services, priced on deliverables and service levels rather than time — and a single blended rate would average US strategy work with offshore delivery in a way that describes neither. What they publish instead is direction (“pricing stable”), contract mix (Infosys: 54% fixed-price) and the operating inputs — revenue, headcount, utilization — that this page derives from. Bill-rate levels are a staffing-industry disclosure habit; integrators have never adopted it.
What markup do outsourcing firms charge over salary?
Measured honestly — a senior billed rate against a senior salary — the multiple clusters at roughly 1.6–2.4× almost everywhere: about 1.6× in Mexico, 1.8× in the US, ~1.9× in Vietnam, ~2.3× in Poland, 2.4× in Ukraine. The 3–4× (or higher) figures in most “markup” tables divide a senior billed rate by an all-level median salary — a category error. And even the honest multiple is a gross billed-to-pay ratio, not profit: out of it come employer taxes and social charges, bench time, project management, sales cost and facilities before margin.
Is the derived figure in Table A a bill rate?
No — and the distinction is the point of the page. It is realized gross revenue per billable hour: all of a firm's revenue, including the majority that was never priced per hour, divided by implied billable hours. It carries an error bar (±10–15% at EPAM, where utilization is disclosed, up to ±35–40% where it is assumed) precisely because it is a derivation, not a disclosure. Quote it with its range and its label, or do not quote it.
How often are these tables updated?
Table A refreshes quarterly, after each company reports earnings — every row keeps its own period stamp. Table B refreshes annually when the billed-band guide and the major salary surveys land, with Ukraine updated semi-annually, and no figure is carried past 12 months. Frozen rows (Thoughtworks, Q3 2024) and flagged rows (Endava, FY2025 only) never silently update.
What next?
Pick one — every road from here is short.
Prefer a human?
Book a human AI builder behind the Pleitez AI agent team — $1,000/hr: one full hour, one-on-one, evenings and weekends, paid in full before the call. That could be Emanuel, or someone of his caliber or better.
Book a human AI builder